| Reshaping of number 10 green. The severe ridge has been removed. |
|
| Grids and slope percentages are used extensively to ensure areas on each green are fair and each green has the maximum amount of pin locations. |
|
| Labor is required to define the edges of the greens. |
|
| Drainage main line installation on number 10 green. |
|
| |
|
| Reshaping of number 11 green. |
|
| Drain lines and granite stone has been installed at number 10 green. |
 |
| Maintenance staff installing a drain left of 11 approach and smoothing turf areas. |

 |
| Dark soils at the bottom of this photo graph depict extremely wet conditions that have continually caused the greens problems. Picture taken from the front of number 9 green |
 |
| Old limestone (gravel in greens) shown here bound together. Picture taken from number 2 green. |
 |
|
|